United States of America · Generation facilities

Magnolia Solar

공식 원천의 전력 객체 · Unverified

Project stage · source basis
Stage requires verification · unknown
Reported operator
Tampa Electric Co
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
27.917716, -82.048697

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860

Magnolia Solar

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)69 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-d2a2ff470ec28415299f2aa9
Detailed source fields
Original source fieldPublished value or condition
Utility ID18454
Utility NameTampa Electric Co
Plant Code64657
Plant NameMagnolia Solar
Street Address5050 Highway 60
CityMulberry
StateFL
Zip33860
CountyPolk
Latitude27.917716
Longitude-82.048697
NERC RegionSERC
Balancing Authority CodeTEC
Balancing Authority NameTampa Electric Company
Primary Purpose (NAICS Code)22
Regulatory StatusRE
Sector1
Sector NameElectric Utility
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Transmission or Distribution System OwnerTampa Electric Co
Transmission or Distribution System Owner ID18454
Transmission or Distribution System Owner StateFL
Grid Voltage (kV)69
Energy StorageN
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:11867

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:11867

Sources EV-d2a2ff470ec28415299f2aa9
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 dc722c792f94cef98127cd5cd975ca6a4c75b7ad77cbefffa4b035047c81e9e6

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel