East Nash PV2
Generation facilities · Unverified
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Grid Voltage (kV) | 115 kV | Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-762660399ca1abdb1455bf50 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Utility ID | 61298 |
| Utility Name | Pine Gate Renewables |
| Plant Code | 63789 |
| Plant Name | East Nash PV2 |
| Street Address | 7300 US 64 A |
| City | Spring Hope |
| State | NC |
| Zip | 27882 |
| County | Nash |
| Latitude | 35.955653 |
| Longitude | -78.093622 |
| NERC Region | SERC |
| Balancing Authority Code | CPLE |
| Balancing Authority Name | Duke Energy Progress East |
| Primary Purpose (NAICS Code) | 22 |
| Regulatory Status | NR |
| Sector | 2 |
| Sector Name | IPP Non-CHP |
| FERC Cogeneration Status | N |
| FERC Small Power Producer Status | Y |
| FERC Small Power Producer Docket Number | 17-585-000 |
| FERC Exempt Wholesale Generator Status | N |
| Transmission or Distribution System Owner | Duke Energy Progress - (NC) |
| Transmission or Distribution System Owner ID | 3046 |
| Transmission or Distribution System Owner State | NC |
| Grid Voltage (kV) | 115 |
| Energy Storage | N |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | 2___Plant_Y2025.xlsx#Plant:11062 |
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 2___Plant_Y2025.xlsx#Plant:11062
Sources EV-762660399ca1abdb1455bf50Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 501bab8caae36f89057ac0920953d6d017b1883db7ea7b8a554460f851bfebf6
Usage terms US government public domain