United States of America · Generation facilities

M72 West Solar

공식 원천의 전력 객체 · Unverified

Project stage · source basis
Stage requires verification · unknown
Reported operator
Heritage Sustainable Energy. LLC
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
44.776787, -85.701356

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860

M72 West Solar

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)14.5 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-939fb5ed984237c57ce7aa60
Detailed source fields
Original source fieldPublished value or condition
Utility ID62870
Utility NameHeritage Sustainable Energy. LLC
Plant Code63660
Plant NameM72 West Solar
Street Address7827 E.Harrys Rd
CityTraverse City
StateMI
Zip49684
CountyLeelanau
Latitude44.776787
Longitude-85.701356
NERC RegionRFC
Balancing Authority CodeMISO
Balancing Authority NameMidcontinent Independent Transmission System Operator, Inc..
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Transmission or Distribution System OwnerCity of Traverse City - (MI)
Transmission or Distribution System Owner ID19125
Transmission or Distribution System Owner StateMI
Grid Voltage (kV)14.5
Energy StorageN
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:10942

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:10942

Sources EV-939fb5ed984237c57ce7aa60
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 930ab4440e02871ba3b117ed0a5c25dbc28ba1780d3f2ad274ada77a211495e8

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel