United States of America · Generation facilities

Aulander Hwy 42 Solar, LLC

공식 원천의 전력 객체 · Unverified

Project stage · source basis
Stage requires verification · unknown
Reported operator
Cardinal Renewables
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
36.248563, -77.085241

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860

Aulander Hwy 42 Solar, LLC

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)34.5 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-03126881f3146c6c7e795ae7
Detailed source fields
Original source fieldPublished value or condition
Utility ID62627
Utility NameCardinal Renewables
Plant Code63332
Plant NameAulander Hwy 42 Solar, LLC
Street Address1625 NC 11 S
CityAulander
StateNC
Zip27805
CountyHertford
Latitude36.248563
Longitude-77.085241
NERC RegionSERC
Balancing Authority CodePJM
Balancing Authority NamePJM Interconnection, LLC
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusY
FERC Small Power Producer Docket Number15-444-001
FERC Exempt Wholesale Generator StatusN
Transmission or Distribution System OwnerVirginia Electric & Power Co
Transmission or Distribution System Owner ID19876
Transmission or Distribution System Owner StateNC
Grid Voltage (kV)34.5
Energy StorageN
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:10637

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:10637

Sources EV-03126881f3146c6c7e795ae7
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 f07d8e114e30783fe61f7a9b13602ea062f250542b16084f457eff58d6543832

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel