Athens - Coopers Corner BESS
Generation facilities · Unverified
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Grid Voltage (kV) | 12.47 kV | Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-e231c891fab84cb01430081c |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Utility ID | 62731 |
| Utility Name | Gopher Energy Storage, LLC |
| Plant Code | 63090 |
| Plant Name | Athens - Coopers Corner BESS |
| Street Address | 26896 University Avenue Northw |
| City | Isanti |
| State | MN |
| Zip | 55040 |
| County | Isanti |
| Latitude | 45.458119 |
| Longitude | -93.26763 |
| NERC Region | MRO |
| Balancing Authority Code | MISO |
| Balancing Authority Name | Midcontinent Independent Transmission System Operator, Inc.. |
| Primary Purpose (NAICS Code) | 22 |
| Regulatory Status | NR |
| Sector | 2 |
| Sector Name | IPP Non-CHP |
| FERC Cogeneration Status | N |
| FERC Small Power Producer Status | N |
| FERC Exempt Wholesale Generator Status | N |
| Transmission or Distribution System Owner | Connexus Energy |
| Transmission or Distribution System Owner ID | 689 |
| Transmission or Distribution System Owner State | MN |
| Grid Voltage (kV) | 12.47 |
| Energy Storage | Y |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | 2___Plant_Y2025.xlsx#Plant:10422 |
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 2___Plant_Y2025.xlsx#Plant:10422
Sources EV-e231c891fab84cb01430081cEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 cd8a4f701c45e15dd93f61fa5b66ee63986406a2678c40f46b34bb7287ac8144
Usage terms US government public domain