United States of America · Generation facilities

Vallecito

공식 원천의 전력 객체 · Unverified

Project stage · source basis
Stage requires verification · unknown
Reported operator
Viridity Energy Solutions, Inc.
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
34.407086, -119.511547

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860

Vallecito

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)34.5 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-ab9605ff017b9982a84daf1d
Detailed source fields
Original source fieldPublished value or condition
Utility ID61522
Utility NameViridity Energy Solutions, Inc.
Plant Code62801
Plant NameVallecito
Street Address5134 Foothill Road
CityCarpinteria
StateCA
Zip93013
CountySanta Barbara
Latitude34.407086
Longitude-119.511547
NERC RegionWECC
Balancing Authority CodeCISO
Balancing Authority NameCalifornia Independent System Operator
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Transmission or Distribution System OwnerSouthern California Edison Co
Transmission or Distribution System Owner ID17609
Transmission or Distribution System Owner StateCA
Grid Voltage (kV)34.5
Energy StorageY
Natural Gas StorageN
Liquefied Natural Gas StorageX
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:10168

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:10168

Sources EV-ab9605ff017b9982a84daf1d
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8ce8c3a3eb5f60349219f3a3de211954641f4d793283129dd0e800fd23d6f546

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel