Adams Nielson Solar
Generation facilities · Unverified
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Grid Voltage (kV) | 0.48 kV | Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-92795b0987cc1604eeabf3e4 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Utility ID | 64778 |
| Utility Name | Strata Manager, LLC |
| Plant Code | 61933 |
| Plant Name | Adams Nielson Solar |
| Street Address | 475 North Nielson Road |
| City | Lind |
| State | WA |
| Zip | 99341 |
| County | Adams |
| Latitude | 46.95528 |
| Longitude | -118.621244 |
| NERC Region | WECC |
| Balancing Authority Code | AVA |
| Balancing Authority Name | Avista Corporation |
| Primary Purpose (NAICS Code) | 22 |
| Regulatory Status | NR |
| Sector | 2 |
| Sector Name | IPP Non-CHP |
| FERC Cogeneration Status | N |
| FERC Small Power Producer Status | N |
| FERC Exempt Wholesale Generator Status | N |
| Transmission or Distribution System Owner | Avista Corp |
| Transmission or Distribution System Owner ID | 20169 |
| Transmission or Distribution System Owner State | WA |
| Grid Voltage (kV) | 0.48 |
| Energy Storage | N |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | 2___Plant_Y2025.xlsx#Plant:9408 |
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 2___Plant_Y2025.xlsx#Plant:9408
Sources EV-92795b0987cc1604eeabf3e4Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 0f8cf3b3d8364d13b2ee2902655614b882c792c6a65fc814397ee83bb5751905
Usage terms US government public domain
