United States of America · Generation facilities

Burt County Wind

공식 원천의 전력 객체 · Unverified

Project stage · source basis
Stage requires verification · unknown
Reported operator
RWE Clean Energy
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
41.886, -96.345

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860

Burt County Wind

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)161 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-f033124a5fcc50205b46ae5c
Detailed source fields
Original source fieldPublished value or condition
Utility ID67192
Utility NameRWE Clean Energy
Plant Code61511
Plant NameBurt County Wind
Street AddressTBD
CityOakland
StateNE
Zip68045
CountyBurt
Latitude41.886
Longitude-96.345
NERC RegionMRO
Balancing Authority CodeSWPP
Balancing Authority NameSouthwest Power Pool
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Transmission or Distribution System OwnerOmaha Public Power District
Transmission or Distribution System Owner ID14127
Transmission or Distribution System Owner StateNE
Grid Voltage (kV)161
Energy StorageN
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:9011

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:9011

Sources EV-f033124a5fcc50205b46ae5c
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 16014c86a23207dbd08b47ec6220b114adfb2de7d11097d54c585d95ffaa3109

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel