United States of America · Generation facilities

Dunn

공식 원천의 전력 객체 · Unverified

Project stage · source basis
Stage requires verification · unknown
Reported operator
Cypress Creek Renewables
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
35.34854, -78.5532

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860

Dunn

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)22.86 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-bbe3d4ea0f8c1955b7a5569f
Detailed source fields
Original source fieldPublished value or condition
Utility ID61060
Utility NameCypress Creek Renewables
Plant Code59376
Plant NameDunn
Street Address700 Webb Road
CityDunn
StateNC
Zip28334
CountyHarnett
Latitude35.34854
Longitude-78.5532
NERC RegionSERC
Balancing Authority CodeCPLE
Balancing Authority NameDuke Energy Progress East
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusY
FERC Small Power Producer Docket Number12.270.001
FERC Exempt Wholesale Generator StatusN
Ash Impoundment?N
Ash Impoundment Lined?X
Transmission or Distribution System OwnerDuke Energy Progress - (NC)
Transmission or Distribution System Owner ID3046
Transmission or Distribution System Owner StateNC
Grid Voltage (kV)22.86
Energy StorageN
Natural Gas StorageX
Liquefied Natural Gas StorageX
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:7163

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:7163

Sources EV-bbe3d4ea0f8c1955b7a5569f
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 aa2cc68a8621ca93fc98aba84dfca65df7eb87a6d37396634dd77dc3f41a514b

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel