United States of America · Generation facilities

Mt Olive Farm 2

공식 원천의 전력 객체 · Unverified

Project stage · source basis
Stage requires verification · unknown
Reported operator
Strata Manager, LLC
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
35.218056, -78.069722

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860

Mt Olive Farm 2

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)22.86 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-dc32bdf660767a751fcdfc65
Detailed source fields
Original source fieldPublished value or condition
Utility ID64778
Utility NameStrata Manager, LLC
Plant Code58345
Plant NameMt Olive Farm 2
Street Address574 Bert Martin Road
CityMt Olive
StateNC
Zip28365
CountyWayne
Latitude35.218056
Longitude-78.069722
NERC RegionSERC
Balancing Authority CodeCPLE
Balancing Authority NameDuke Energy Progress East
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusY
FERC Small Power Producer Docket Number12-281-000
FERC Exempt Wholesale Generator StatusN
Ash Impoundment Lined?X
Transmission or Distribution System OwnerDuke Energy Progress - (NC)
Transmission or Distribution System Owner ID3046
Transmission or Distribution System Owner StateNC
Grid Voltage (kV)22.86
Energy StorageN
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:6301

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:6301

Sources EV-dc32bdf660767a751fcdfc65
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 febfb910f4e9133bd5c965b40724e58c8321e04ffaac5c11bf5bb5f29b377c5f

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel