United States of America · Generation facilities

Berkeley County Landfill

공식 원천의 전력 객체 · Unverified

Project stage · source basis
Stage requires verification · unknown
Reported operator
South Carolina Public Service Authority
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
33.121111, -80.029444

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860

Berkeley County Landfill

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)12.5 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-5288be29f6adfc7339fa5197
Detailed source fields
Original source fieldPublished value or condition
Utility ID17543
Utility NameSouth Carolina Public Service Authority
Plant Code57945
Plant NameBerkeley County Landfill
Street Address2277 Hwy 52
CityMoncks Corner
StateSC
Zip29761
CountyBerkeley
Latitude33.121111
Longitude-80.029444
NERC RegionSERC
Balancing Authority CodeSC
Balancing Authority NameSouth Carolina Public Service Authority
Primary Purpose (NAICS Code)22
Regulatory StatusRE
Sector1
Sector NameElectric Utility
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Ash Impoundment?N
Ash Impoundment Lined?X
Transmission or Distribution System OwnerBerkeley Electric Coop Inc
Transmission or Distribution System Owner ID1613
Transmission or Distribution System Owner StateSC
Grid Voltage (kV)12.5
Energy StorageN
Natural Gas StorageX
Liquefied Natural Gas StorageX
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:5952

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:5952

Sources EV-5288be29f6adfc7339fa5197
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 206e4da55ea1343ef3dad4cfdb6b6d98c2cfc61779651860787bfdc2811d127b

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel