United States of America · Generation facilities

Ellenburg

공식 원천의 전력 객체 · Unverified

Project stage · source basis
Stage requires verification · unknown
Reported operator
Valcour Operating Services, LLC
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
44.8914, -74.0061

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860

Ellenburg

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)230 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-862fbd6431d209eaf69d2fff
Detailed source fields
Original source fieldPublished value or condition
Utility ID63858
Utility NameValcour Operating Services, LLC
Plant Code56619
Plant NameEllenburg
Street Address386 Ryan Road
CityChurubusco
StateNY
Zip12923
CountyClinton
Latitude44.8914
Longitude-74.0061
NERC RegionNPCC
Balancing Authority CodeNYIS
Balancing Authority NameNew York Independent System Operator
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Ash Impoundment Lined?X
Transmission or Distribution System OwnerNew York Power Authority
Transmission or Distribution System Owner ID15296
Grid Voltage (kV)230
Energy StorageN
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:4903

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:4903

Sources EV-862fbd6431d209eaf69d2fff
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 27cddaee91a9d70f5c6e4f40c317de7a5d9b809b1af5ed7254960c22becd0f62

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel