United States of America · Generation facilities

Tsar Nicholas LLC

공식 원천의 전력 객체 · Unverified

Project stage · source basis
Stage requires verification · unknown
Reported operator
CHI Operations Inc
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
44.42, -96.4347

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860

Tsar Nicholas LLC

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)34.5 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-5e18ef6e90ef38bbef7a2781
Detailed source fields
Original source fieldPublished value or condition
Utility ID54725
Utility NameCHI Operations Inc
Plant Code55561
Plant NameTsar Nicholas LLC
Street Address2510 115th Ave
CityHendricks
StateMN
Zip56136
CountyLincoln
Latitude44.42
Longitude-96.4347
NERC RegionMRO
Balancing Authority CodeMISO
Balancing Authority NameMidcontinent Independent Transmission System Operator, Inc..
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Ash Impoundment Lined?X
Transmission or Distribution System OwnerNorthern States Power Co - Minnesota
Transmission or Distribution System Owner ID13781
Transmission or Distribution System Owner StateMN
Grid Voltage (kV)34.5
Energy StorageN
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:4279

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:4279

Sources EV-5e18ef6e90ef38bbef7a2781
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 cac6cf25676a401c261fac9b1d23b976ecd7c40edde5149977eae2f4f1da8db9

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel