Bridgeport Gas Processing Plant
Generation facilities · Unverified
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Grid Voltage (kV) | 12.5 kV | Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-d73abca174ff46cc409a02f1 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Utility ID | 59366 |
| Utility Name | EnLink Midstream Services, LLC |
| Plant Code | 55053 |
| Plant Name | Bridgeport Gas Processing Plant |
| Street Address | 415 Private Rd, 3502 |
| City | Bridgeport |
| State | TX |
| Zip | 76426 |
| County | Wise |
| Latitude | 33.195763 |
| Longitude | -97.802547 |
| NERC Region | TRE |
| Balancing Authority Code | ERCO |
| Balancing Authority Name | Electric Reliability Council of Texas, Inc. |
| Primary Purpose (NAICS Code) | 211 |
| Regulatory Status | NR |
| Sector | 6 |
| Sector Name | Industrial Non-CHP |
| FERC Cogeneration Status | N |
| FERC Small Power Producer Status | N |
| FERC Exempt Wholesale Generator Status | N |
| Ash Impoundment? | N |
| Ash Impoundment Lined? | X |
| Transmission or Distribution System Owner | Wise Electric Coop Inc |
| Transmission or Distribution System Owner ID | 20948 |
| Transmission or Distribution System Owner State | TX |
| Grid Voltage (kV) | 12.5 |
| Energy Storage | N |
| Natural Gas Pipeline Name 1 | Other - Please explain in pipeline notes below. |
| Pipeline Notes | The generators supply a portion of plant power only. There is no connection to the grid to sell or supply power outside of the plant. |
| Natural Gas Storage | N |
| Liquefied Natural Gas Storage | X |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | 2___Plant_Y2025.xlsx#Plant:4001 |
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 2___Plant_Y2025.xlsx#Plant:4001
Sources EV-d73abca174ff46cc409a02f1Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b25d7cb95b337a5d35fa4c66a01f5b3bc59bbb209f6267deb7f672b57ccbdb34
Usage terms US government public domain