Galesburg
Generation facilities · Unverified
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Grid Voltage (kV) | 12 kV | Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-cf320893fac8e99d1b1113da |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Utility ID | 772 |
| Utility Name | Archer Daniels Midland Co |
| Plant Code | 54310 |
| Plant Name | Galesburg |
| Street Address | 1021 South Henderson |
| City | Galesburg |
| State | IL |
| Zip | 61401 |
| County | Knox |
| Latitude | 40.9 |
| Longitude | -90.3333 |
| NERC Region | SERC |
| Balancing Authority Code | MISO |
| Balancing Authority Name | Midcontinent Independent Transmission System Operator, Inc.. |
| Name of Water Source | Municipality |
| Primary Purpose (NAICS Code) | 311 |
| Regulatory Status | NR |
| Sector | 7 |
| Sector Name | Industrial CHP |
| FERC Cogeneration Status | N |
| FERC Small Power Producer Status | N |
| FERC Exempt Wholesale Generator Status | N |
| Ash Impoundment Lined? | X |
| Grid Voltage (kV) | 12 |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | 2___Plant_Y2025.xlsx#Plant:3691 |
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 2___Plant_Y2025.xlsx#Plant:3691
Sources EV-cf320893fac8e99d1b1113daEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 5ce787a5d50a508b4fa4bee789be1ca1b7a9e03e3f5a19964d4d963a2d786a47
Usage terms US government public domain