J K Smith
Generation facilities · Unverified
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Grid Voltage (kV) | 138 kV | Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-2d882e864ea32f4ebd0898fc |
| Grid Voltage 2 (kV) | 345 kV | Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-2d882e864ea32f4ebd0898fc |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Utility ID | 5580 |
| Utility Name | East Kentucky Power Coop, Inc |
| Plant Code | 54 |
| Plant Name | J K Smith |
| Street Address | 12145 Irvine Road |
| City | Winchester |
| State | KY |
| Zip | 40391 |
| County | Clark |
| Latitude | 37.8833 |
| Longitude | -84.1017 |
| NERC Region | SERC |
| Balancing Authority Code | PJM |
| Balancing Authority Name | PJM Interconnection, LLC |
| Name of Water Source | Kentucky River |
| Primary Purpose (NAICS Code) | 22 |
| Regulatory Status | RE |
| Sector | 1 |
| Sector Name | Electric Utility |
| FERC Cogeneration Status | N |
| FERC Small Power Producer Status | N |
| FERC Exempt Wholesale Generator Status | N |
| Ash Impoundment? | N |
| Ash Impoundment Lined? | X |
| Transmission or Distribution System Owner | East Kentucky Power Coop, Inc |
| Transmission or Distribution System Owner ID | 5580 |
| Grid Voltage (kV) | 138 |
| Grid Voltage 2 (kV) | 345 |
| Energy Storage | N |
| Natural Gas Pipeline Name 1 | TENNESSEE GAS PIPELINE COMPANY |
| Natural Gas Pipeline Name 2 | TEXAS EASTERN TRANSMISSION LP |
| Natural Gas Storage | N |
| Liquefied Natural Gas Storage | X |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | 2___Plant_Y2025.xlsx#Plant:33 |
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 2___Plant_Y2025.xlsx#Plant:33
Sources EV-2d882e864ea32f4ebd0898fcEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 28cf73412d94980a346939592dffc7a90730930f3c3e2a96970c72035845c4e0
Usage terms US government public domain