Dolet Hills
Generation facilities · Unverified
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Grid Voltage (kV) | 345 kV | Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-cc32cb9337e29da0fd2e5ef6 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Utility ID | 3265 |
| Utility Name | Cleco Power LLC |
| Plant Code | 51 |
| Plant Name | Dolet Hills |
| Street Address | 963 Power Plant Rd |
| City | Mansfield |
| State | LA |
| Zip | 71052 |
| County | DeSoto |
| Latitude | 32.030556 |
| Longitude | -93.569167 |
| NERC Region | SERC |
| Balancing Authority Code | MISO |
| Balancing Authority Name | Midcontinent Independent Transmission System Operator, Inc.. |
| Name of Water Source | Toledo Bend Lake |
| Primary Purpose (NAICS Code) | 22 |
| Regulatory Status | RE |
| Sector | 1 |
| Sector Name | Electric Utility |
| FERC Cogeneration Status | N |
| FERC Small Power Producer Status | N |
| FERC Exempt Wholesale Generator Status | N |
| Ash Impoundment? | Y |
| Ash Impoundment Lined? | Y |
| Ash Impoundment Status | OS |
| Transmission or Distribution System Owner | Cleco Power LLC |
| Transmission or Distribution System Owner ID | 3265 |
| Transmission or Distribution System Owner State | LA |
| Grid Voltage (kV) | 345 |
| Energy Storage | N |
| Natural Gas LDC Name | Other - See pipeline notes. |
| Natural Gas Pipeline Name 1 | ENLINK LIG LLC |
| Pipeline Notes | Per our Supervisor of NG procurement, "none of these are LDC's. They are interstate and/or intrastate pipelines." |
| Natural Gas Storage | N |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | 2___Plant_Y2025.xlsx#Plant:31 |
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 2___Plant_Y2025.xlsx#Plant:31
Sources EV-cc32cb9337e29da0fd2e5ef6Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8738a70b174b4ff5e7e004432adb2872efd0b1d78f8cdf9f1e4502e48d5530aa
Usage terms US government public domain