United States of America · Generation facilities

Douglas Dam

공식 원천의 전력 객체 · Unverified

Project stage · source basis
Stage requires verification · unknown
Reported operator
Tennessee Valley Authority
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
35.9623, -83.5393

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860

Douglas Dam

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)161 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-47725be344de00ef9a4ecc9b
Detailed source fields
Original source fieldPublished value or condition
Utility ID18642
Utility NameTennessee Valley Authority
Plant Code3400
Plant NameDouglas Dam
Street Address850 Powerhouse Way
CityDandridge
StateTN
Zip37725
CountySevier
Latitude35.9623
Longitude-83.5393
NERC RegionSERC
Balancing Authority CodeTVA
Balancing Authority NameTennessee Valley Authority
Name of Water SourceFrench Broad River
Primary Purpose (NAICS Code)22
Regulatory StatusRE
Sector1
Sector NameElectric Utility
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Ash Impoundment Lined?X
Transmission or Distribution System OwnerTennessee Valley Authority
Transmission or Distribution System Owner ID18642
Transmission or Distribution System Owner StateTN
Grid Voltage (kV)161
Energy StorageN
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:1623

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:1623

Sources EV-47725be344de00ef9a4ecc9b
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 980fd042316ceb559228fb23503b88b5667b2e8cd33b9ac9b71b125711f7a101

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel