United States of America · Generation facilities

Big Creek 2

공식 원천의 전력 객체 · Unverified

Project stage · source basis
Stage requires verification · unknown
Reported operator
Southern California Edison Co
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
37.2, -119.3069

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860

Big Creek 2

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)220 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-ec6831937d8377d17187c056
Detailed source fields
Original source fieldPublished value or condition
Utility ID17609
Utility NameSouthern California Edison Co
Plant Code318
Plant NameBig Creek 2
Street Address53615 Upper Chawanakee Road
CityAuberry
StateCA
Zip93605
CountyFresno
Latitude37.2
Longitude-119.3069
NERC RegionWECC
Balancing Authority CodeCISO
Balancing Authority NameCalifornia Independent System Operator
Name of Water SourceSan Joaquin River
Primary Purpose (NAICS Code)22
Regulatory StatusRE
Sector1
Sector NameElectric Utility
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Ash Impoundment Lined?X
Transmission or Distribution System OwnerSouthern California Edison Co
Transmission or Distribution System Owner ID17609
Transmission or Distribution System Owner StateCA
Grid Voltage (kV)220
Energy StorageN
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:199

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:199

Sources EV-ec6831937d8377d17187c056
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 be884e53493d0ee97a0553635e99f797157ff4a62514dd6cdf574c61184f3cc0

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel