United States of America · Generation facilities

Refuse & Coal

공식 원천의 전력 객체 · Unverified

Project stage · source basis
Stage requires verification · unknown
Reported operator
City of Columbus - (OH)
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
39.902222, -83.024444

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860

Refuse & Coal

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID4065
Utility NameCity of Columbus - (OH)
Plant Code312
Plant NameRefuse & Coal
Street Address2500 Jackson Pike
CityCOLUMBUS
StateOH
Zip43223
CountyFranklin
Latitude39.902222
Longitude-83.024444
NERC RegionRFC
Name of Water SourceQuarry Pond
Primary Purpose (NAICS Code)22
Regulatory StatusRE
Sector1
Sector NameElectric Utility
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Ash Impoundment?N
Ash Impoundment Lined?X
Transmission or Distribution System OwnerCity of Columbus - (OH)
Transmission or Distribution System Owner ID4065
Transmission or Distribution System Owner StateOH
Energy StorageN
Natural Gas StorageN
Liquefied Natural Gas StorageN
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:193

No separate metric summary is available. Consult the detailed source fields.

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:193

Sources EV-c351f85c9386a32fb2aa1c38
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d4e4e4b7861dcd3605be5b1cdd35244000b4298479c7243d820b4b67ea8532bc

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel