Beluga / 6
Generator · Out of service
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 76.5 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-647e51dc6973f5e5dbc16638 |
| Net Summer Capacity (MW) | 72.6 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-647e51dc6973f5e5dbc16638 |
| Net Winter Capacity (MW) | 79.2 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-647e51dc6973f5e5dbc16638 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 3522 |
| Entity Name | Chugach Electric Assn Inc |
| Plant ID | 96 |
| Plant Name | Beluga |
| Google Map | Map |
| Bing Map | Map |
| Plant State | AK |
| County | Kenai Peninsula |
| Sector | Electric Utility |
| Generator ID | 6 |
| Unit Code | BCC8 |
| Nameplate Capacity (MW) | 76.5 |
| Net Summer Capacity (MW) | 72.6 |
| Net Winter Capacity (MW) | 79.2 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Operating Month | 5 |
| Operating Year | 1976 |
| Status | (OS) Out of service and NOT expected to return to service in next calendar year |
| Latitude | 61.1861 |
| Longitude | -151.0356 |
| Original text | (OS) Out of service and NOT expected to return to service in next calendar year |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:230 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:229
Sources EV-ab89a8b3929de1125fbd2cefEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 bc8fafb02ebf85aeedd6ae6f721c977054903fed90a4a1dcfc4208e62fcae36e
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:230
Sources EV-647e51dc6973f5e5dbc16638Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 7f113612a518c4db7d392ee4f6bb2b618597b784ed46d630a9fad309506d7ba2
Usage terms US government public domain
