Copper / 1
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 86.9 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-0c642efa1a2532ce534c004b |
| Net Summer Capacity (MW) | 63 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-0c642efa1a2532ce534c004b |
| Net Winter Capacity (MW) | 65 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-0c642efa1a2532ce534c004b |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 5701 |
| Entity Name | El Paso Electric Co |
| Plant ID | 9 |
| Plant Name | Copper |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | El Paso |
| Balancing Authority Code | EPE |
| Sector | Electric Utility |
| Generator ID | 1 |
| Nameplate Capacity (MW) | 86.9 |
| Net Summer Capacity (MW) | 63 |
| Net Winter Capacity (MW) | 65 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Operating Month | 7 |
| Operating Year | 1980 |
| Planned Retirement Month | 12 |
| Planned Retirement Year | 2030 |
| Status | (OP) Operating |
| Latitude | 31.7569 |
| Longitude | -106.375 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:26 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:25
Sources EV-4b311674115f49875188de80Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1552298735cd2fe2ada83b2b5221b1d7bbec671de598bad0ede4a50e93fbd5fa
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:26
Sources EV-0c642efa1a2532ce534c004bEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 88e86ebfa70814bd84a56d928eb6e856b716258635bdd9c760ba2b62d41a0284
Usage terms US government public domain
