United States of America · Generator · plant location

Newington / 1

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Granite Shore Power
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
43.1, -70.79083

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Newington / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)414 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-bd17d5d21901d55db9466f23
Net Summer Capacity (MW)400.2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-bd17d5d21901d55db9466f23
Net Winter Capacity (MW)400.2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-bd17d5d21901d55db9466f23
Detailed source fields
Original source fieldPublished value or condition
Entity ID62032
Entity NameGranite Shore Power
Plant ID8002
Plant NameNewington
Google MapMap
Bing MapMap
Plant StateNH
CountyRockingham
Balancing Authority CodeISNE
SectorIPP Non-CHP
Generator ID1
Nameplate Capacity (MW)414
Net Summer Capacity (MW)400.2
Net Winter Capacity (MW)400.2
TechnologyPetroleum Liquids
Energy Source CodeRFO
Prime Mover CodeST
Operating Month6
Operating Year1974
Status(OP) Operating
Latitude43.1
Longitude-70.79083
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:8016

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:8014

Sources EV-4547e2c21677e2b96636ca6b
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 c9d6cbd3b30cd038c239de8b859f732a4cc2086fc0d933c114a72e329b757f71

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:8016

Sources EV-bd17d5d21901d55db9466f23
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 1b06871f37840bcc6331f1217fb9a6f44049675d89bfc4fb31f40db1cb4e4a1b

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel