Future CT / 1
Generator · Cancelled or postponed
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 28 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-cc69a520138717064285e051 |
| Net Summer Capacity (MW) | 24 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-cc69a520138717064285e051 |
| Net Winter Capacity (MW) | 28 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-cc69a520138717064285e051 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 13809 |
| Entity Name | NorthWestern Energy - (SD) |
| Plant ID | 7956 |
| Plant Name | Future CT |
| Google Map | Map |
| Bing Map | Map |
| Plant State | SD |
| County | Hyde |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | 1 |
| Nameplate Capacity (MW) | 28 |
| Net Summer Capacity (MW) | 24 |
| Net Winter Capacity (MW) | 28 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Latitude | 44.5225 |
| Longitude | -99.44111 |
| Original text | Canceled or Postponed |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Canceled or Postponed:205 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:3036
Sources EV-d8be44f55571f9d70c8e97d3Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 551788f3fc72e00b16b94e2a1b1b62111837c8d2ccda0b37ffb8c3fb1a8e25cc
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Canceled or Postponed:205
Sources EV-cc69a520138717064285e051Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 33ed569c49084a7101dffc9f4ec35368bff8f90c565e05de25f85f5bb63ceb8b
Usage terms US government public domain
