United States of America · Generator · plant location

Lakefield Junction / 6

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Great River Energy
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
43.798439, -94.84145

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Lakefield Junction / 6

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)89.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-248f58af01897f8c174b103e
Net Summer Capacity (MW)83.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-248f58af01897f8c174b103e
Net Winter Capacity (MW)105.6 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-248f58af01897f8c174b103e
Detailed source fields
Original source fieldPublished value or condition
Entity ID7570
Entity NameGreat River Energy
Plant ID7925
Plant NameLakefield Junction
Google MapMap
Bing MapMap
Plant StateMN
CountyMartin
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID6
Nameplate Capacity (MW)89.3
Net Summer Capacity (MW)83.4
Net Winter Capacity (MW)105.6
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Operating Month6
Operating Year2001
Status(OP) Operating
Latitude43.798439
Longitude-94.84145
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:7842

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:7840

Sources EV-dc04704b39e93f0f508e58c4
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 85e106bb9060bdd13383111b90f75d650788ebb89bfbd655f0740908c30b8c73

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:7842

Sources EV-248f58af01897f8c174b103e
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 387d0e860d05b09f46b93d5edd0e8a614f9584a4a6b0cb6ecf1d0451f1cd8f5b

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel