United States of America · Generator · plant location

Unnamed / GT2

공식 원천의 전력 객체 · Cancelled or postponed

Project stage · source basis
Stage requires verification · cancelled_or_postponed
Reported operator
Seminole Electric Cooperative Inc
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Unnamed / GT2

Generator · Cancelled or postponed

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)193 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-fadf6c7b8cc3c1793b7993d8
Net Summer Capacity (MW)153 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-fadf6c7b8cc3c1793b7993d8
Net Winter Capacity (MW)182 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-fadf6c7b8cc3c1793b7993d8
Detailed source fields
Original source fieldPublished value or condition
Entity ID21554
Entity NameSeminole Electric Cooperative Inc
Plant ID7890
Plant NameUnnamed
Plant StateFL
Balancing Authority CodeSEC
SectorElectric Utility
Generator IDGT2
Nameplate Capacity (MW)193
Net Summer Capacity (MW)153
Net Winter Capacity (MW)182
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeGT
Original textCanceled or Postponed
source_record_idCanceled or Postponed:180

Parent facility or plant record

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2992

Sources EV-9f2a2d6a96673f167bd93287
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 0a2953103b9b3d0eab257e0a2722ac31a1ca05b701559f32ce973e6f2166c3d9

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Canceled or Postponed:180

Sources EV-fadf6c7b8cc3c1793b7993d8
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 2db6e843134df122fcd45ce06e08b2a3f59567829381d7338752aa97addcc2d0

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel