United States of America · Generator · plant location

Encogen / CTG1

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Puget Sound Energy Inc
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
48.746, -122.486

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Encogen / CTG1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)39.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6eb8dce2f3866e3a313c9be8
Net Summer Capacity (MW)34.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6eb8dce2f3866e3a313c9be8
Net Winter Capacity (MW)42.2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6eb8dce2f3866e3a313c9be8
Detailed source fields
Original source fieldPublished value or condition
Entity ID15500
Entity NamePuget Sound Energy Inc
Plant ID7870
Plant NameEncogen
Google MapMap
Bing MapMap
Plant StateWA
CountyWhatcom
Balancing Authority CodePSEI
SectorElectric Utility
Generator IDCTG1
Unit CodeCC1
Nameplate Capacity (MW)39.4
Net Summer Capacity (MW)34.5
Net Winter Capacity (MW)42.2
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCT
Operating Month3
Operating Year1993
Status(OP) Operating
Latitude48.746
Longitude-122.486
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:7738

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:7736

Sources EV-830549d2f519eea28b74b2d3
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 2dc93b9c9a1abacc0aadd592dea7a4d529dc123dafd083993d009ed016c7eaad

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:7738

Sources EV-6eb8dce2f3866e3a313c9be8
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 62334f54a59b34172c56daa7ae0116f2efd54e67672c60ea27d76f14f468d091

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel