Unknown / GT6
Generator · Cancelled or postponed
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 180 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-a0582ea2659a9822a3af161a |
| Net Summer Capacity (MW) | 153 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-a0582ea2659a9822a3af161a |
| Net Winter Capacity (MW) | 182 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-a0582ea2659a9822a3af161a |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 21554 |
| Entity Name | Seminole Electric Cooperative Inc |
| Plant ID | 7738 |
| Plant Name | Unknown |
| Google Map | Map |
| Bing Map | Map |
| Plant State | FL |
| County | Hardee |
| Sector | Electric Utility |
| Generator ID | GT6 |
| Nameplate Capacity (MW) | 180 |
| Net Summer Capacity (MW) | 153 |
| Net Winter Capacity (MW) | 182 |
| Technology | Petroleum Liquids |
| Energy Source Code | DFO |
| Prime Mover Code | GT |
| Latitude | 27.627778 |
| Longitude | -81.845 |
| Original text | Canceled or Postponed |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Canceled or Postponed:148 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2944
Sources EV-92207e2596add01af92dcca5Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 12de9668ce9599f811d8e9e7eb6364e8babdf886369c4b3b19b9806a52bb8546
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Canceled or Postponed:148
Sources EV-a0582ea2659a9822a3af161aEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 819a0f9618e90b799315f83eb4d697ea986ddd5a069132d73f426346904a9533
Usage terms US government public domain
