Unknown / GT5
Generator · Cancelled or postponed
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 180 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-02c8d5389ac7286a5d94af3b |
| Net Summer Capacity (MW) | 153 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-02c8d5389ac7286a5d94af3b |
| Net Winter Capacity (MW) | 182 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-02c8d5389ac7286a5d94af3b |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 21554 |
| Entity Name | Seminole Electric Cooperative Inc |
| Plant ID | 7738 |
| Plant Name | Unknown |
| Google Map | Map |
| Bing Map | Map |
| Plant State | FL |
| County | Hardee |
| Sector | Electric Utility |
| Generator ID | GT5 |
| Nameplate Capacity (MW) | 180 |
| Net Summer Capacity (MW) | 153 |
| Net Winter Capacity (MW) | 182 |
| Technology | Petroleum Liquids |
| Energy Source Code | DFO |
| Prime Mover Code | GT |
| Latitude | 27.627778 |
| Longitude | -81.845 |
| Original text | Canceled or Postponed |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Canceled or Postponed:147 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2943
Sources EV-532c9d81a8aec2022fb4a5c4Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 eefae65d520ba4038e78c80c98b7f88e739c103934016578dcabb2e08f99c7e7
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Canceled or Postponed:147
Sources EV-02c8d5389ac7286a5d94af3bEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 de1ad2450d25c9b44a317177ea1e6d9952ca07f86368afeeeb8cf1de6fc3ffd6
Usage terms US government public domain
