United States of America · Generator · plant location

Future Gen Plant 1 / 1

공식 원천의 전력 객체 · Cancelled or postponed

Project stage · source basis
Stage requires verification · cancelled_or_postponed
Reported operator
Duke Energy Progress - (NC)
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Future Gen Plant 1 / 1

Generator · Cancelled or postponed

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)211.8 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-d3e6905e9d5473fc3e5019ed
Net Summer Capacity (MW)162 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-d3e6905e9d5473fc3e5019ed
Net Winter Capacity (MW)180 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-d3e6905e9d5473fc3e5019ed
Detailed source fields
Original source fieldPublished value or condition
Entity ID3046
Entity NameDuke Energy Progress - (NC)
Plant ID7727
Plant NameFuture Gen Plant 1
Plant StateNC
Balancing Authority CodeCPLE
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)211.8
Net Summer Capacity (MW)162
Net Winter Capacity (MW)180
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCC
Original textCanceled or Postponed
source_record_idCanceled or Postponed:139

Parent facility or plant record

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2934

Sources EV-f8a3a39a99ba39db5e8ac598
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 c1f2c93f430e42c182e94ba21047f5f80a4e79654e68b54f27803f9919ef9244

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Canceled or Postponed:139

Sources EV-d3e6905e9d5473fc3e5019ed
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 9ab089f18538f21cfa45a16e48b0691be1e399227f9af0f44b1e3a99f3f96585

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel