United States of America · Generator · plant location

Blue Ridge / 1

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Tennessee Valley Authority
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
34.883889, -84.28222

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Blue Ridge / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)22 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-fdef80933390889112181eb9
Net Summer Capacity (MW)16 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-fdef80933390889112181eb9
Net Winter Capacity (MW)13.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-fdef80933390889112181eb9
Detailed source fields
Original source fieldPublished value or condition
Entity ID18642
Entity NameTennessee Valley Authority
Plant ID757
Plant NameBlue Ridge
Google MapMap
Bing MapMap
Plant StateGA
CountyFannin
Balancing Authority CodeTVA
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)22
Net Summer Capacity (MW)16
Net Winter Capacity (MW)13.4
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month7
Operating Year1931
Status(OP) Operating
Latitude34.883889
Longitude-84.28222
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:1277

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:1271

Sources EV-2c672ba8ec85d75d9bef1e62
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 f16453bd2512a0bc7bc8f67d5bbd5d9f1cdbfa790182cb851cf9c82789468ae7

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:1277

Sources EV-fdef80933390889112181eb9
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 cf2940c1de66cf396af3d4045f040ffb51fdf4cbba5422451e219c981ef0fc4b

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel