United States of America · Generator · plant location

NA 1 (NC) / 9

공식 원천의 전력 객체 · Cancelled or postponed

Project stage · source basis
Stage requires verification · cancelled_or_postponed
Reported operator
Duke Energy Progress - (NC)
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

NA 1 (NC) / 9

Generator · Cancelled or postponed

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)195.3 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-00d8c42696f56f71373e3932
Net Summer Capacity (MW)155 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-00d8c42696f56f71373e3932
Net Winter Capacity (MW)180 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-00d8c42696f56f71373e3932
Detailed source fields
Original source fieldPublished value or condition
Entity ID3046
Entity NameDuke Energy Progress - (NC)
Plant ID7539
Plant NameNA 1 (NC)
Plant StateNC
CountyNOT IN FILE
Balancing Authority CodeCPLE
SectorElectric Utility
Generator ID9
Nameplate Capacity (MW)195.3
Net Summer Capacity (MW)155
Net Winter Capacity (MW)180
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCT
Original textCanceled or Postponed
source_record_idCanceled or Postponed:126

Parent facility or plant record

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2896

Sources EV-f149aabbc19026496ab1e407
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 9f6da6a41392e51338c1611dbb4d3185f813ef8a1accca79fd986ac20711cfcf

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Canceled or Postponed:126

Sources EV-00d8c42696f56f71373e3932
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 cc7fd527e78cab95bba945fed0d1cc3aec17708ff8e95caa1d820f40e08f8bba

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel