Wayne County Energy Complex / 3
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 195.2 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-04cb8a35e654c0900f2ec99c |
| Net Summer Capacity (MW) | 164 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-04cb8a35e654c0900f2ec99c |
| Net Winter Capacity (MW) | 195 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-04cb8a35e654c0900f2ec99c |
| Planned Uprate of Summer Capacity (MW) | 6 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-04cb8a35e654c0900f2ec99c |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 3046 |
| Entity Name | Duke Energy Progress - (NC) |
| Plant ID | 7538 |
| Plant Name | Wayne County Energy Complex |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NC |
| County | Wayne |
| Balancing Authority Code | CPLE |
| Sector | Electric Utility |
| Generator ID | 3 |
| Nameplate Capacity (MW) | 195.2 |
| Net Summer Capacity (MW) | 164 |
| Net Winter Capacity (MW) | 195 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Operating Month | 6 |
| Operating Year | 2000 |
| Status | (OP) Operating |
| Planned Uprate Year | 2029 |
| Planned Uprate Month | 4 |
| Planned Uprate of Summer Capacity (MW) | 6 |
| Latitude | 35.375789 |
| Longitude | -78.09805 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:7384 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:7382
Sources EV-154c5eff0b88264e6c075311Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 f84d8b48e7c06b677e3bcaac751e5dda19e427f58ce5de2c54660462bb817d8a
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:7384
Sources EV-04cb8a35e654c0900f2ec99cEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ea6ed35ee8ab8471126fd6a9293335bf704fa44f5dfa9941dfa4395812970280
Usage terms US government public domain
