Wayne County Energy Complex / 1
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 195.2 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-b4412859c60eb5c8c08921d8 |
| Net Summer Capacity (MW) | 169 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-b4412859c60eb5c8c08921d8 |
| Net Winter Capacity (MW) | 195 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-b4412859c60eb5c8c08921d8 |
| Planned Uprate of Summer Capacity (MW) | 6 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-b4412859c60eb5c8c08921d8 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 3046 |
| Entity Name | Duke Energy Progress - (NC) |
| Plant ID | 7538 |
| Plant Name | Wayne County Energy Complex |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NC |
| County | Wayne |
| Balancing Authority Code | CPLE |
| Sector | Electric Utility |
| Generator ID | 1 |
| Nameplate Capacity (MW) | 195.2 |
| Net Summer Capacity (MW) | 169 |
| Net Winter Capacity (MW) | 195 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Operating Month | 5 |
| Operating Year | 2000 |
| Status | (OP) Operating |
| Planned Uprate Year | 2029 |
| Planned Uprate Month | 4 |
| Planned Uprate of Summer Capacity (MW) | 6 |
| Latitude | 35.375789 |
| Longitude | -78.09805 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:7382 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:7380
Sources EV-ec8481c4031d3de347dc2a42Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 780f03ea8b0031b4d4148e0f2b65bd15e5f779024a3dee95fa132e3d4384c9ac
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:7382
Sources EV-b4412859c60eb5c8c08921d8Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 50cada449fb70ceac5a40bd61518d0bc59744174e0633b4f84648a6d2bf84411
Usage terms US government public domain
