United States of America · Generator · plant location

King Cove / 1

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
City of King Cove - (AK)
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
55.04817, -162.2932

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

King Cove / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)1.1 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ea301da80c7f05e502ed9f25
Net Summer Capacity (MW)1.1 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ea301da80c7f05e502ed9f25
Net Winter Capacity (MW)1.1 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ea301da80c7f05e502ed9f25
Detailed source fields
Original source fieldPublished value or condition
Entity ID9897
Entity NameCity of King Cove - (AK)
Plant ID7493
Plant NameKing Cove
Google MapMap
Bing MapMap
Plant StateAK
CountyAleutians East
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)1.1
Net Summer Capacity (MW)1.1
Net Winter Capacity (MW)1.1
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeIC
Operating Month6
Operating Year2008
Status(OP) Operating
Latitude55.04817
Longitude-162.2932
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:7346

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:7344

Sources EV-cd892a72634ba07f67d3348e
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b455f41727a2014b39fe4fec12af2c3cfa08f261605a30356f2d1917e8cbead1

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:7346

Sources EV-ea301da80c7f05e502ed9f25
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 5d2b17e2ccca555ce0ddb6dc5f67daf122bcc1835b6e2d5c0dc7f5865d52e871

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel