United States of America · Generator · plant location

NSB Anaktuvuk Pass / 1

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
North Slope Borough Power & Light (AK)
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
68.13795, -151.741

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

NSB Anaktuvuk Pass / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-380bace3fab06ab1c8b0e23c
Net Summer Capacity (MW)0.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-380bace3fab06ab1c8b0e23c
Net Winter Capacity (MW)0.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-380bace3fab06ab1c8b0e23c
Detailed source fields
Original source fieldPublished value or condition
Entity ID26616
Entity NameNorth Slope Borough Power & Light (AK)
Plant ID7487
Plant NameNSB Anaktuvuk Pass
Google MapMap
Bing MapMap
Plant StateAK
CountyNorth Slope
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)0.3
Net Summer Capacity (MW)0.3
Net Winter Capacity (MW)0.3
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeIC
Operating Month9
Operating Year1994
Status(OP) Operating
Latitude68.13795
Longitude-151.741
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:7334

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:7332

Sources EV-7f72b30e1cbace8d16624cf9
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e24a206f41854a2d33dc296388420bdabd076ebcd88326508abdb2291594734a

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:7334

Sources EV-380bace3fab06ab1c8b0e23c
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ce6b8dfe46703d0bd5955d942b915c1d83d6ef2854abc812a991c74733400520

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel