United States of America · Generator · plant location

Clover / 2

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Virginia Electric & Power Co
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
36.869, -78.704

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Clover / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)424 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-09ac027fa48870d14ad0299b
Net Summer Capacity (MW)437.1 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-09ac027fa48870d14ad0299b
Net Winter Capacity (MW)439 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-09ac027fa48870d14ad0299b
Detailed source fields
Original source fieldPublished value or condition
Entity ID19876
Entity NameVirginia Electric & Power Co
Plant ID7213
Plant NameClover
Google MapMap
Bing MapMap
Plant StateVA
CountyHalifax
Balancing Authority CodePJM
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)424
Net Summer Capacity (MW)437.1
Net Winter Capacity (MW)439
TechnologyConventional Steam Coal
Energy Source CodeBIT
Prime Mover CodeST
Operating Month3
Operating Year1996
Status(OP) Operating
Latitude36.869
Longitude-78.704
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:7053

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:7057

Sources EV-2a53daa8d3b1fe8ce893b394
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b744907134c212e5f7654331b93b3fa0a89703f3bdf337cd940d8cbb09e7f2d5

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:7053

Sources EV-09ac027fa48870d14ad0299b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 32c9ce21889410ea2ed65413e1d6da24ea8ef65d2e82aebe649379316b0cd6a3

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel