United States of America · Generator · plant location

McManus / 4D

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Georgia Power Co
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
31.213645, -81.54617

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

McManus / 4D

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)65.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-8bcf048a10febf97d370b9cc
Net Summer Capacity (MW)46 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-8bcf048a10febf97d370b9cc
Net Winter Capacity (MW)57 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-8bcf048a10febf97d370b9cc
Detailed source fields
Original source fieldPublished value or condition
Entity ID7140
Entity NameGeorgia Power Co
Plant ID715
Plant NameMcManus
Google MapMap
Bing MapMap
Plant StateGA
CountyGlynn
Balancing Authority CodeSOCO
SectorElectric Utility
Generator ID4D
Nameplate Capacity (MW)65.3
Net Summer Capacity (MW)46
Net Winter Capacity (MW)57
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeGT
Operating Month12
Operating Year1972
Status(OP) Operating
Latitude31.213645
Longitude-81.54617
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:1215

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:1209

Sources EV-9103f1d4b3c02a5acb48ae15
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 9849dd5f2538ef97ddf637897c1708b3bae0aaee1a046a74bc15b2d564361ee7

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:1215

Sources EV-8bcf048a10febf97d370b9cc
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 86101d6891fb1ae5534578e7c8feb33b7ec25fb86588086aa03e62df590c27d5

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel