United States of America · Generator · plant location

McManus / 3B

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Georgia Power Co
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
31.213645, -81.54617

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

McManus / 3B

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)55.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-de45e67ba70e0e504935f73f
Net Summer Capacity (MW)46 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-de45e67ba70e0e504935f73f
Net Winter Capacity (MW)57 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-de45e67ba70e0e504935f73f
Detailed source fields
Original source fieldPublished value or condition
Entity ID7140
Entity NameGeorgia Power Co
Plant ID715
Plant NameMcManus
Google MapMap
Bing MapMap
Plant StateGA
CountyGlynn
Balancing Authority CodeSOCO
SectorElectric Utility
Generator ID3B
Nameplate Capacity (MW)55.4
Net Summer Capacity (MW)46
Net Winter Capacity (MW)57
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeGT
Operating Month1
Operating Year1972
Status(OP) Operating
Latitude31.213645
Longitude-81.54617
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:1210

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:1204

Sources EV-98b0af23c2c7408aac023917
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 cf918aa9a999b993db26ad7363e4008d2b867f13d608a8d04bfad946a3e1e7cc

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:1210

Sources EV-de45e67ba70e0e504935f73f
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 b4a16e9a6864e19e4de39603b42dc55a2fb46fd07a2f2d4c4d6f16557b82eb2b

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel