United States of America · Generator · plant location

Lloyd Shoals / 5

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Georgia Power Co
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
33.3207, -83.8414

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Lloyd Shoals / 5

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)2.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-aece5c42a72c59c4fb36347b
Net Summer Capacity (MW)3.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-aece5c42a72c59c4fb36347b
Net Winter Capacity (MW)3.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-aece5c42a72c59c4fb36347b
Detailed source fields
Original source fieldPublished value or condition
Entity ID7140
Entity NameGeorgia Power Co
Plant ID712
Plant NameLloyd Shoals
Google MapMap
Bing MapMap
Plant StateGA
CountyJasper
Balancing Authority CodeSOCO
SectorElectric Utility
Generator ID5
Nameplate Capacity (MW)2.4
Net Summer Capacity (MW)3.8
Net Winter Capacity (MW)3.8
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month12
Operating Year1916
Status(OP) Operating
Latitude33.3207
Longitude-83.8414
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:1206

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:1200

Sources EV-5cced654a33f1a37cfccd21f
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 06ec09fe62373e5d98dd3c88466f5de36d3e8e7c75cc3ba124c4850359a5b29b

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:1206

Sources EV-aece5c42a72c59c4fb36347b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 314792dd08d5c9ad2973c502b9cd165597b8af3bdd4171e7f548b2f4520f3e54

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel