NCBP TEN, LLC / NCB10
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 1.4 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-0a80d050bf9e3926d6de9785 |
| Net Summer Capacity (MW) | 1.4 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-0a80d050bf9e3926d6de9785 |
| Net Winter Capacity (MW) | 1.4 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-0a80d050bf9e3926d6de9785 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 65539 |
| Entity Name | Pivot Energy |
| Plant ID | 70338 |
| Plant Name | NCBP TEN, LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MD |
| County | Prince Georges |
| Balancing Authority Code | PJM |
| Sector | IPP Non-CHP |
| Generator ID | NCB10 |
| Nameplate Capacity (MW) | 1.4 |
| Net Summer Capacity (MW) | 1.4 |
| Net Winter Capacity (MW) | 1.4 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 10 |
| Planned Operation Year | 2026 |
| Status | (V) Under construction, more than 50 percent complete |
| Latitude | 38.867 |
| Longitude | -76.7386 |
| Original text | (V) Under construction, more than 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:314 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2754
Sources EV-fd2d35ec5369baf60049640cEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 685c9d791ab9711eca907fc927ea0eb7ac69cb24e47dce12cea24ff6c783abea
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:314
Sources EV-0a80d050bf9e3926d6de9785Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 04f8f4e73ce2d6a2cd6bda1e0319cb9aeec5e9b41ce70e756d2989fc557b7235
Usage terms US government public domain