NCBP ONE, LLC / NCBP1
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 2.5 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-69d93054befcbd5afcffece2 |
| Net Summer Capacity (MW) | 2.5 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-69d93054befcbd5afcffece2 |
| Net Winter Capacity (MW) | 2.5 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-69d93054befcbd5afcffece2 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 65539 |
| Entity Name | Pivot Energy |
| Plant ID | 70336 |
| Plant Name | NCBP ONE, LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MD |
| County | Prince Georges |
| Balancing Authority Code | PJM |
| Sector | IPP Non-CHP |
| Generator ID | NCBP1 |
| Nameplate Capacity (MW) | 2.5 |
| Net Summer Capacity (MW) | 2.5 |
| Net Winter Capacity (MW) | 2.5 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 10 |
| Planned Operation Year | 2026 |
| Status | (V) Under construction, more than 50 percent complete |
| Latitude | 38.8698 |
| Longitude | -76.7394 |
| Original text | (V) Under construction, more than 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:312 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2752
Sources EV-8f1e73c406d41f86150eaa68Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 addf6d2607399ccde1215a4e48eb35c1f2d370fdf48fc166258af1de4a978f52
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:312
Sources EV-69d93054befcbd5afcffece2Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 be65572f9b57d6422d24c88c66327c9e5cf3ab5787ef77cd2fba2f75d2c553b5
Usage terms US government public domain