Pivot Solar 42 LLC / PS42
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 1.9 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-93ce91abe4be27873782dad7 |
| Net Summer Capacity (MW) | 1.9 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-93ce91abe4be27873782dad7 |
| Net Winter Capacity (MW) | 1.9 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-93ce91abe4be27873782dad7 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 65539 |
| Entity Name | Pivot Energy |
| Plant ID | 70335 |
| Plant Name | Pivot Solar 42 LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | CO |
| County | Larimer |
| Balancing Authority Code | PSCO |
| Sector | IPP Non-CHP |
| Generator ID | PS42 |
| Nameplate Capacity (MW) | 1.9 |
| Net Summer Capacity (MW) | 1.9 |
| Net Winter Capacity (MW) | 1.9 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 10 |
| Planned Operation Year | 2026 |
| Status | (V) Under construction, more than 50 percent complete |
| Latitude | 40.692398 |
| Longitude | -104.9833 |
| Original text | (V) Under construction, more than 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:311 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2751
Sources EV-28c29499f2115aa1df7a2d6aEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 2514c61831b8f7023312d54b966fd7eee068ac0edd73c983d0920b0cba11a94c
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:311
Sources EV-93ce91abe4be27873782dad7Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 496ab08aace3ee441d1962213281b302edc3d140dc54caddc92404dd6a4ccaa4
Usage terms US government public domain
