Turnpike Solar Plant / TPSP1
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 74.9 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-57c566812d2f41c03867ea5d |
| Net Summer Capacity (MW) | 74.9 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-57c566812d2f41c03867ea5d |
| Net Winter Capacity (MW) | 74.9 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-57c566812d2f41c03867ea5d |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 6455 |
| Entity Name | Duke Energy Florida, LLC |
| Plant ID | 70223 |
| Plant Name | Turnpike Solar Plant |
| Google Map | Map |
| Bing Map | Map |
| Plant State | FL |
| County | Osceola |
| Balancing Authority Code | FPC |
| Sector | Electric Utility |
| Generator ID | TPSP1 |
| Nameplate Capacity (MW) | 74.9 |
| Net Summer Capacity (MW) | 74.9 |
| Net Winter Capacity (MW) | 74.9 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 2 |
| Planned Operation Year | 2027 |
| Status | (V) Under construction, more than 50 percent complete |
| Latitude | 28.063296 |
| Longitude | -81.22305 |
| Original text | (V) Under construction, more than 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:676 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2677
Sources EV-d03d3be334e0fd3a1439353fEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 967a8fff51186282e0e776fb716b143aae469953a97f4dc02fdbcd06c24856e3
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:676
Sources EV-57c566812d2f41c03867ea5dEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 83a3414856e1c048dbcf51ccc386304e03162b9b482083626bf5b34a7796df0a
Usage terms US government public domain
