Pivot Solar 60 LLC / PS60
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 1.1 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-e240dc5295f9c3a2630bfadf |
| Net Summer Capacity (MW) | 1.1 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-e240dc5295f9c3a2630bfadf |
| Net Winter Capacity (MW) | 1.1 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-e240dc5295f9c3a2630bfadf |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 65539 |
| Entity Name | Pivot Energy |
| Plant ID | 70207 |
| Plant Name | Pivot Solar 60 LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | CO |
| County | Weld |
| Balancing Authority Code | PSCO |
| Sector | IPP Non-CHP |
| Generator ID | PS60 |
| Nameplate Capacity (MW) | 1.1 |
| Net Summer Capacity (MW) | 1.1 |
| Net Winter Capacity (MW) | 1.1 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 10 |
| Planned Operation Year | 2026 |
| Status | (V) Under construction, more than 50 percent complete |
| Latitude | 40.474398 |
| Longitude | -104.623 |
| Original text | (V) Under construction, more than 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:304 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2669
Sources EV-cc279e287ca5e7dff0c54393Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1e666e2c1323e9dbbf305ff41b00aa0834fb05e6fc55085a5e70d42232239ccb
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:304
Sources EV-e240dc5295f9c3a2630bfadfEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 79b03b72dba8807e6b4dec40cfb7a7b33fa4e22953099a586b029efa3d27bf1e
Usage terms US government public domain
