Pivot Solar 56 LLC / PS56
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 3.6 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-f7d4ddff5ca11bf15111ba31 |
| Net Summer Capacity (MW) | 3.6 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-f7d4ddff5ca11bf15111ba31 |
| Net Winter Capacity (MW) | 3.6 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-f7d4ddff5ca11bf15111ba31 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 65539 |
| Entity Name | Pivot Energy |
| Plant ID | 70202 |
| Plant Name | Pivot Solar 56 LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | CO |
| County | Weld |
| Balancing Authority Code | PSCO |
| Sector | IPP Non-CHP |
| Generator ID | PS56 |
| Nameplate Capacity (MW) | 3.6 |
| Net Summer Capacity (MW) | 3.6 |
| Net Winter Capacity (MW) | 3.6 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 2 |
| Planned Operation Year | 2027 |
| Status | (V) Under construction, more than 50 percent complete |
| Latitude | 40.350547 |
| Longitude | -104.7226 |
| Original text | (V) Under construction, more than 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:675 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2664
Sources EV-88b2ec57743459f4ccb158acEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e62797e6cba68466b5f9d496d434f1db4c6d389a558ca305d7233a2a5ef93078
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:675
Sources EV-f7d4ddff5ca11bf15111ba31Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 271bfa5550e4a23094379bd1c209038dcf851240570741055d8782f985492f00
Usage terms US government public domain