Jade Solar 3 / JADES
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 1.5 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-4aa70e4d78561ea9b489cdd7 |
| Net Summer Capacity (MW) | 1.5 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-4aa70e4d78561ea9b489cdd7 |
| Net Winter Capacity (MW) | 1.5 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-4aa70e4d78561ea9b489cdd7 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 60059 |
| Entity Name | ZGlobal Inc |
| Plant ID | 70106 |
| Plant Name | Jade Solar 3 |
| Google Map | Map |
| Bing Map | Map |
| Plant State | CA |
| County | Madera |
| Balancing Authority Code | CISO |
| Sector | IPP Non-CHP |
| Generator ID | JADES |
| Nameplate Capacity (MW) | 1.5 |
| Net Summer Capacity (MW) | 1.5 |
| Net Winter Capacity (MW) | 1.5 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 6 |
| Planned Operation Year | 2027 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 37.056528 |
| Longitude | -119.9805 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:898 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2610
Sources EV-1e96f9012b99af17c0ace895Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 5fc43b514822d87836be57ecca0aad418791cece34b6f61767e40eca2da4986e
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:898
Sources EV-4aa70e4d78561ea9b489cdd7Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 423659b1c36bf0064be88a526a79b5d6fb91154fe92e124ebc87c832bcb3428a
Usage terms US government public domain
