Jade Solar 3 / JADEB
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 1.5 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-072fcd0aea1cccb026d2a930 |
| Net Summer Capacity (MW) | 1.5 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-072fcd0aea1cccb026d2a930 |
| Net Winter Capacity (MW) | 1.5 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-072fcd0aea1cccb026d2a930 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 60059 |
| Entity Name | ZGlobal Inc |
| Plant ID | 70106 |
| Plant Name | Jade Solar 3 |
| Google Map | Map |
| Bing Map | Map |
| Plant State | CA |
| County | Madera |
| Balancing Authority Code | CISO |
| Sector | IPP Non-CHP |
| Generator ID | JADEB |
| Nameplate Capacity (MW) | 1.5 |
| Net Summer Capacity (MW) | 1.5 |
| Net Winter Capacity (MW) | 1.5 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 6 |
| Planned Operation Year | 2027 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 37.056528 |
| Longitude | -119.9805 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:897 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2609
Sources EV-3b8ac0db98cd7c9386ee1290Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 9622867488d4b36636c3cd73df78ca4ca83bfd836a83a2afadbdd9ac6ce3bdc2
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:897
Sources EV-072fcd0aea1cccb026d2a930Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 502be4d3df67bcbb6a9392e37a14ed738cac40a11b73fd3002dd71f9cfd3e525
Usage terms US government public domain