Pivot Solar 33 LLC / PS33
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 5 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-d7132182e64319455e17eebc |
| Net Summer Capacity (MW) | 5 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-d7132182e64319455e17eebc |
| Net Winter Capacity (MW) | 5 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-d7132182e64319455e17eebc |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 65539 |
| Entity Name | Pivot Energy |
| Plant ID | 70102 |
| Plant Name | Pivot Solar 33 LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | CO |
| County | Weld |
| Balancing Authority Code | PSCO |
| Sector | IPP Non-CHP |
| Generator ID | PS33 |
| Nameplate Capacity (MW) | 5 |
| Net Summer Capacity (MW) | 5 |
| Net Winter Capacity (MW) | 5 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 1 |
| Planned Operation Year | 2027 |
| Status | (V) Under construction, more than 50 percent complete |
| Latitude | 40.32508 |
| Longitude | -104.731 |
| Original text | (V) Under construction, more than 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:642 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2604
Sources EV-71edbe176a386eab547e45a6Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e0591c044b1f909a74352c1eace7a1d0b3b4d0211758775cbe1d4f0bb76d2a76
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:642
Sources EV-d7132182e64319455e17eebcEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ba4c19c8713f3be961cc8fa003c3c6dcf531a952c6261eb0bdfdbb752ef47464
Usage terms US government public domain
