Liberty Keefer Mill Road Solar LLC / KEEFE
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 3 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-d1824fb07b8cd8b5f3493db8 |
| Net Summer Capacity (MW) | 3 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-d1824fb07b8cd8b5f3493db8 |
| Net Winter Capacity (MW) | 3 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-d1824fb07b8cd8b5f3493db8 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 65677 |
| Entity Name | Dimension Energy LLC |
| Plant ID | 70032 |
| Plant Name | Liberty Keefer Mill Road Solar LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | PA |
| County | Montour |
| Balancing Authority Code | PJM |
| Sector | IPP Non-CHP |
| Generator ID | KEEFE |
| Nameplate Capacity (MW) | 3 |
| Net Summer Capacity (MW) | 3 |
| Net Winter Capacity (MW) | 3 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 6 |
| Planned Operation Year | 2028 |
| Status | (T) Regulatory approvals received. Not under construction |
| Latitude | 41.030468 |
| Longitude | -76.68827 |
| Original text | (T) Regulatory approvals received. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1576 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2553
Sources EV-8c457eb850bc560835189dbbEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 eb622033e270f94c38e592433cb5afb6a2192a08f74c1fb72e207f29567912d1
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1576
Sources EV-d1824fb07b8cd8b5f3493db8Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 2c37b66d3820101e74f1d8c96a59a50ecdd5a90543906e61610e7e53b0dcd6b2
Usage terms US government public domain
